| NAME OF PROJECT |
LOCATION |
COST OF PROJECT |
COMPLETION STATUS |
NOTES |
| Test on highway road |
Russia ((N. Novgorod) |
Free |
Completed in 2007 |
Monitoring/Comparison report is being delivered in June
2008 |
| Test on gravel road |
Georgia and
Krasnodar Oblast (Russia)
|
$ 50,000 |
Completed in 2007 |
Negotiation for further local and rural road 1800 km
construction |
| Leviev Ecoroads Dynamic cone penetrometer |
Russia,
Moscow
|
Designing and manufacturing sample unit $12,500 |
Device is manufactured and tested in 2007-2008 |
Estimated yearly needs are estimated as 50-60 units
per year |
| Highway from Astana to Yekaterinburg |
Russia-Kazakhstan |
$11,100,000 US (Total length with main temporary roads
is 200 km |
Initial main and gravel road design revision |
Estimated time for construction and monitoring equipment
delivery is June 2008. Engineering services all along
construction duration (re-designing, rate application
and monitoring ). |
| Rural 6 km. road near Alma Ate |
Kazakhstan |
$225 000 |
Road cross-section design revision |
Estimated time for construction is July 2008 |
Soil Brick manufacturing
Plant
|
Russia,
Costroma
|
Revision of the
business plan for plant refurbishing
|
August 2008
|
Estimated plant capacity is 30,000,000 brick per year |
Soil Brick manufacturing
Plant
|
India |
Project funding from Israel is negotiated |
2008 |
Estimated plant capacity is 50,000,000 brick per year |
| Construction of road in small towns |
Argentina |
Technology and equipment testing in Patagonia |
Third quarter of 2008 |
Total contractual length of roads is around 30 km. |
| Afghanistan Government Road Project |
Afghanistan and Tajikistani |
$20,000,000 US.
Construction team training and construction
|
2008-2010
|
Total contractual length of roads is around 500 km.
All scopes of engineering services included |
| Rural road construction and implementation of local
premises for soil brick manufacturing |
Tanzania,
Congo,
Namibia
|
$250,000 for initial testing, roads construction and
brick machines implementation |
Forth quarter of 2008 |
Total contractual length of roads is around 1000, including
20 km. during 2008.
All scopes of engineering services included
|
| Technology of concrete blocks hardening for trench pipe
construction |
Tanzania |
$125,000 |
2008-2009
|
Main usage is trench less collectors construction and
pipe jacking |
| Slope of highway construction on unstable soils |
Russia,
Caucasus
|
Estimated as $3,000,000 US |
Design to be provided for re-designing in 3 quarter
of 2008 |
Special technologies for compaction on slopes and its
monitoring are in questions |
| Testing on the airstrip at Moscow Airport |
Russia,
Moscow Oblast
|
$50,000 |
Initial offer is under consideration |
3 quarter of 2008 |
| General offer to Moscow city Road Construction Council
|
Russia,
Moscow
|
Under estimation |
|
2008 -2011 |
| Service road for S-Petersburg Power Plant |
Russia,
Leningrad Oblast
|
Initial engineering offer from the Client and general
Distributor’s Agreement are under negotiations |
Should begins in 2008 |
All scopes of engineering services requested |
| Road construction |
Kirgizia, Beshkeck & Latvia
(Riga and its suburbs)
|
$37000 US per one km. of road
Two layers asphalt motorway is designed
|
3 quarter of 2008 |
Soil-cement layer is to be replaced by soil layer, stabilized
by enzymes admixes. All scopes of services included |
| In-situ soil compaction and road profile monitoring
technologies |
USA, Germany,
Russia, Kazakhstan
|
$200,000 US |
2008-2009 |
|
| Road construction |
Malaysia, Indonsia, & Mongolia
|
$37000 US per one km. of road |
3 quarter of 2008 |
Soil-cement or soil-gravel layers are to be replaced
by soil layer, stabilized by enzymes admixes. All scopes
of services included |
| Manufacturing of concrete internal retaining units (for
underground tunnels and collectors). |
Bangladesh,
Dacha
|
Joint R&D with local and US companies |
|
Under negotiation |
| Road constriction |
Central Africa countries |
$37,000 per km/ Under final estimation for 340 km of
rural roads construction |
2008-2012 |
|
| Marketing for moisture content in-sity measurement |
USA |
$ 16,000 |
June 2008 |
|